capital project management

CAPITAL PROJECT
MANAGEMENT

Tracks project action items, documentation, and drawings.

Includes lifecycles for small and large capital projects.

Crucial to document and drawing control.
Enhanced Productivity.
Capital Project Management.

capital project management

CAPITAL PROJECT
MANAGEMENT

capital project management

CAPITAL PROJECT
MANAGEMENT

Precision from initiation
to close-out.

FACILEX® CP targets Capital Project Management requirements for efficient action item tracking and the means to organize all the supporting documentation and drawings.

Reinforce your process safety system.

FACILEX® is derived from the CCPS Pillars of Process Safety. Capital Project Management is integral to maintaining a safe workplace, preventing accidents, and ensuring compliance with safety regulations. It is a proactive approach to risk mitigation that enhances overall process safety.

Questions?
We have answers.

What capital project lifecycles are typically required?

The Front-End Loading (FEL) process is a structured project management approach used in large capital projects to systematically develop project scope, budget, and schedule with increasing levels of detail. Divided into distinct phases—FEL 1 (Conceptual Design), FEL 2 (Preliminary Engineering), and FEL 3 (Detailed Design)—each stage builds on the last, progressively refining project plans, risk assessments, cost estimates, and design specifics. At the end of each FEL phase, a gate review is conducted to evaluate project readiness and decide whether to proceed to the next phase, adjust the project scope, or halt the project. The FEL process aims to ensure that all aspects of the project are well-defined and understood before major resources are committed, reducing the likelihood of costly changes or delays later in the project and increasing the overall likelihood of success.

For smaller capital projects, alternative project lifecycles that are often more efficient and tailored to limited scope include:

1. Stage-Gate Process: This simplified life cycle involves a series of distinct stages, such as concept, planning, execution, and close-out, with reviews or “gates” between each stage to assess progress and decide on project continuation. This process provides structured checkpoints, suitable for smaller projects that still require some oversight.

2. Agile Project Management: Agile methods, though commonly associated with software development, can be adapted for smaller capital projects where requirements or designs may evolve as the project progresses. Agile focuses on iterative work cycles, allowing teams to deliver smaller, incremental results and adapt to changes effectively.

3. Lean Project Management: Lean methodologies emphasize maximizing value and reducing waste. This approach is well-suited for projects with straightforward objectives where efficiency is key, focusing on minimizing unnecessary steps, enhancing process flow, and achieving cost and time savings.

4. Design-Build: For smaller construction-focused capital projects, the Design-Build approach integrates design and construction phases, often resulting in faster project delivery. With a single entity responsible for both phases, it simplifies coordination and can reduce the risk of miscommunication and delays.

5. Waterfall Approach: The waterfall method is linear and sequential, moving through defined phases—such as initiation, planning, execution, and closure—without much iteration. This approach works well for smaller projects with clear, well-defined goals and minimal expected changes.

Each of these alternative lifecycles provides flexibility to manage smaller projects effectively without the more complex requirements of a full FEL (Front-End Loading) process, making them suitable for projects with constrained resources or shorter timelines.

What if a capital project requires an MOC ?

In a capital project, implementing one or more Management of Change (MOC) processes is often necessary to address the safety and operational implications of design or procedural changes. Each MOC project helps ensure that proposed changes—whether they involve equipment modifications, process updates, or operational adjustments—are thoroughly evaluated for potential risks and documented according to facility standards. Managing these MOCs through to close-out is essential, as it involves completing all required risk assessments, obtaining approvals, updating relevant Process Safety Information (PSI), and training affected personnel on the new changes. Properly closing out each MOC ensures that all changes are fully integrated and compliant with regulatory and safety requirements. This close-out process is critical for the successful completion of the capital project, as it confirms that each change has been safely implemented and accounted for, avoiding operational gaps or safety vulnerabilities that could arise if MOCs were left incomplete.

When should an MOC be initiated during a capital project?

The Management of Change (MOC) process is intended to manage changes proactively, not retroactively. The purpose of MOC is to assess and control risks before changes are implemented, ensuring safety, regulatory compliance, and thorough documentation at each step. Attempting to convert completed work orders into MOCs after the fact bypasses critical safety evaluations and approvals that are central to the MOC process. Additionally, retroactive MOC creation can lead to incomplete documentation, misunderstandings about the change rationale, and potentially missed updates to essential Process Safety Information (PSI). For accurate, safe, and compliant operations, changes requiring MOC should be identified and managed as MOC projects from the outset, with work orders executed in alignment with approved MOC procedures rather than retrospectively adjusting records.

What’s so challenging about managing process safety information (PSI) during a capital project?

Accurate and current Process Safety Information (PSI) is essential to maintaining safe operations, especially during a capital project. As contractors make updates, modifications, or identify discrepancies in process documentation, it is critical to red-line (i.e., mark changes on) PSI documents, such as P&IDs, process flow diagrams, and equipment specifications, to reflect these real-time adjustments. Managing revision control ensures that all stakeholders, including contractors, operators, and engineers, are working with the latest, most accurate information. Without strict version control, outdated or incorrect PSI could lead to misunderstandings about the process conditions or configurations, increasing the risk of safety incidents or project delays. By integrating careful PSI management into the project workflow, companies uphold the CCPS Process Knowledge Management pillar, ensuring that process information remains reliable, accessible, and supports informed decision-making at every project stage.

What if a capital project requires the use of outside contrators?

Using outside contractors during a capital project is a critical aspect of the CCPS Contractor Management pillar, as it requires thorough oversight to ensure contractors understand and adhere to facility safety standards and process requirements. This pillar emphasizes selecting contractors with strong safety records, providing proper training on specific site hazards, and clearly communicating expectations for safe work practices. By carefully managing contractor activities—through orientation, supervision, and periodic audits—companies help ensure that all parties maintain consistent safety practices and comply with regulatory requirements. Effective contractor management minimizes the risk of safety incidents and ensures that external workers contribute positively to a safe project environment, fully aligned with the facility’s process safety objectives.

What if the capital project is adding, modifying or decommissioning assets ?

The addition, modification, or decommissioning of assets during a capital project is a vital part of the CCPS Asset Integrity and Reliability pillar, as it involves managing the physical condition and functionality of equipment to prevent failures that could compromise safety. This pillar emphasizes that any new or modified assets should meet design standards, undergo rigorous inspections, and be tested to verify reliability and compatibility with existing systems. Similarly, decommissioning assets requires careful planning to safely isolate and remove equipment without impacting ongoing operations or introducing hazards. By ensuring that all assets are correctly integrated and maintained during the project, companies uphold the Asset Integrity and Reliability pillar, supporting safe, continuous operations and minimizing the potential for breakdowns or safety incidents.

What training requirements should be consider during a capital project ?

During a capital project, the addition, modification, or decommissioning of assets is closely tied to the CCPS Training and Performance Assurance pillar, as these changes often require updates in employee knowledge and operational skills. Ensuring that personnel are trained on new equipment, modified systems, or revised procedures is essential for maintaining safe and efficient operations. This pillar emphasizes competency through training programs that cover both technical and safety aspects of any updates, helping operators and maintenance teams understand the risks and correct operating methods for the modified assets. Performance assurance activities, such as proficiency assessments or refresher courses, further ensure that all personnel can confidently and safely manage the new or altered assets, reinforcing a culture of safety and reliability in the evolving project environment.